Structure: Lebuhraya Damansara-Puchong, Puchong Jaya interchange (Exit 1114)
Affected: Puchong residents (335,419 population)
Owner/ Management: Lingkaran Trans Kota Sdn Bhd
Design, supervision, construction and commission: Gamuda
Problem: Crack lines at bridge soffit.
I bet that not much people take this seriously (except the concessionaire) although thousands were using this bridge everyday either through the top or passing underneath it.. The possible reason is that these defects do not causing anything fall down yet.
Affected: Puchong residents (335,419 population)
Owner/ Management: Lingkaran Trans Kota Sdn Bhd
Design, supervision, construction and commission: Gamuda
Problem: Crack lines at bridge soffit.
I bet that not much people take this seriously (except the concessionaire) although thousands were using this bridge everyday either through the top or passing underneath it.. The possible reason is that these defects do not causing anything fall down yet.
No comments:
Post a Comment